How to Build a Shed: The 9 Stages From Permit to Roof

4 min read · Updated 25 November 2026

Heads up: this article contains affiliate links. If you buy through them, Weekend Maker earns a commission at no extra cost to you. It never changes what we recommend. Details.

A small wood-framed shed is one of the most satisfying projects a DIYer can take on. It's also bigger than it looks: you'll handle a foundation, framing, a roof and weatherproofing. This guide walks through the nine stages of a typical build so you know what you're signing up for before you buy a single board.

It's an overview, not a construction plan. For the actual build you'll want a plan drawn for your size and roof style, with a materials list and cut list.

Stage 1: Rules, size and site

Check the rules before anything else. Many towns don't require a permit for a small shed below a certain floor area, but the size limit, height limit and distance you must keep from property lines all vary by location. Homeowner associations can add their own rules. A short call to your local building department can save you from having to move or remove a finished shed.

Then choose the site:

  • Level, well-drained ground. Avoid low spots where water collects.
  • Access. Leave room to walk around all four sides while building, and to get a wheelbarrow or mower through the door.
  • Utilities. Before digging, have underground lines located; in many countries this service is free.

Pick a size slightly bigger than you think you need. Nobody has ever said their shed was too large.

Stage 2: Choose the plan and roof style

The roof shape drives most of the plan:

Roof style Looks Build difficulty Good for
Lean-to (single slope) Modern, simple Easiest Against a fence or house wall
Gable (two slopes) Classic Moderate Most garden sheds
Gambrel (barn) Barn-style Harder Loft storage
Saltbox Asymmetric gable Moderate Style with a taller front

If it's your first build, a lean-to or a simple gable is the sensible choice.

Stage 3: Build the foundation

The foundation keeps the floor flat, dry and off the ground. Common options for small sheds are a compacted gravel pad, concrete blocks, treated timber skids, or a concrete slab. Each has trade-offs in cost, effort and lifespan; we compare them in shed foundation types compared.

Whatever you choose, the goal is the same: level and square. Every error here gets copied into the walls and roof.

Stage 4: Frame the floor

The floor frame is a rectangle of joists, typically spaced 16 in (40 cm) on center, sitting on the foundation. Use pressure-treated lumber rated for ground contact for anything close to the soil.

Check for square by measuring both diagonals: when they're equal, the frame is square. Then fix down the floor sheathing, usually exterior-grade plywood or OSB, staggering the joints.

Stage 5: Frame and raise the walls

Walls are built flat on the finished floor, then tilted up. Each wall has a bottom plate, a top plate, and vertical studs, usually at 16 in (40 cm) centers. Door and window openings need a header above them to carry the load around the gap.

Raise each wall, brace it plumb with temporary diagonal boards, and nail the corners together. A second top plate that overlaps the corners ties the walls into one box. Have a helper for this stage; walls are heavy and awkward.

Stage 6: Frame the roof

Roof framing is where most first-time builders slow down. Rafters are cut with angled ends (the plumb cut at the ridge and a birdsmouth notch where they sit on the wall). Cut one rafter, test-fit it, and only then use it as the template for the rest.

Fit rafters in pairs and keep them evenly spaced. Many plans include collar ties or rafter ties to stop the walls spreading under the roof's weight. Don't leave them out.

Stage 7: Sheathing, roofing and weatherproofing

Cover the walls and roof with sheathing, then:

  1. Install drip edge along the roof edges.
  2. Lay roofing underlayment, working from the bottom up so each row overlaps the one below.
  3. Finish with your roofing: asphalt shingles, metal panels or roll roofing.

Water is the enemy of every shed. Overlaps always run so that water flows over the joint, never into it.

Stage 8: Doors, windows and siding

If your walls are sheathed with a siding panel such as T1-11, the siding may already be done. Otherwise, add siding now. Build or hang the door, fit windows, and add trim at corners and around openings.

Doors are a classic sticking point. Build them square, brace them diagonally (the brace should run up from the bottom hinge side), and leave a small gap all round so they don't jam when the wood swells.

Stage 9: Paint, caulk and finish

Caulk the trim joints, prime any bare wood, and paint or stain. Then add ramps, shelving, hooks and a lock. A shed that's painted and maintained will last far longer than one left bare.

How long does it take?

For a first-timer working weekends, a small shed often takes several weekends, depending on size, roof style and how much help you have. The foundation and roof take longer than most people expect.

Getting a plan

You can draw your own plan, adapt a free one, or buy a set. Whatever you use, make sure it includes a materials list, a cut list and drawings for the roof framing, since that's where vague plans hurt most. For a big library of shed designs in different sizes and roof styles, see our My Shed Plans overview.